Testing & Commissioning of following Substations/Transmission Line
Complete Engineering & Design and Electromechanical Erection, Testing & Commissioning of following substations & Transmission Line:
- 2 x 40MVA 132/33kV Substation Ukwa West Substation.
- 2 x 40MVA 132/33kV Substation Ogoja West Substation.
- 2 x 40MVA 132/33kV Substation Ozoro Substation.
- 2 x 40MVA 132/33kV Substation Unghelli Substation.
- 2 x 132kV Line Bays Extension at Unghelli Power Plant (Delta -IV Power Plant).
- 12.3 km, 132kV Transmission Line from Unghelli Power Plant to Unghelli Substation.
- Location: Nigeria.
- Client: ALSDUR Limited.
- End User :Transmission Company Nigeria (TCN)
- Scope of Work: Design, Engineering, Calculations, production of Drawings, and other requisite documentations as agreed. And Complete Erection, Testing & Commissioning.