Testing & Commissioning of following Substations/Transmission Line


Complete Engineering & Design and Electromechanical Erection, Testing & Commissioning of following substations & Transmission Line:

  1. 2 x 40MVA 132/33kV Substation Ukwa West Substation.
  2. 2 x 40MVA 132/33kV Substation Ogoja West Substation.
  3. 2 x 40MVA 132/33kV Substation Ozoro Substation.
  4. 2 x 40MVA 132/33kV Substation Unghelli Substation.
  5. 2 x 132kV Line Bays Extension at Unghelli Power Plant (Delta -IV Power Plant).
  6. 12.3 km, 132kV Transmission Line from Unghelli Power Plant to Unghelli Substation.
  • Location: Nigeria.
  • Client: ALSDUR Limited.
  • End User :Transmission Company Nigeria (TCN)
  • Scope of Work: Design, Engineering, Calculations, production of Drawings, and other requisite documentations as agreed. And Complete Erection, Testing & Commissioning.